The following are plans for ARDOT widening of Interstate 30 from two lanes to three, as of August 2018.
NOTE: If you’re having difficulty loading the PDFs, scroll down to access the JPGs instead.
Here’s the project overview. See more below that.
PDF FILES (3 SETS):
[pdf-embedder url=”https://www.mysaline.com/wp-content/uploads/2019/10/i30-widen-1-33.pdf” title=”i30 widen 1-33″]
[pdf-embedder url=”https://www.mysaline.com/wp-content/uploads/2019/10/i30-widen-34-66.pdf” title=”i30 widen 34-66″]
[pdf-embedder url=”https://www.mysaline.com/wp-content/uploads/2019/10/i30-widen-67-95.pdf” title=”i30 widen 67-95″]
JPG FILES:
Mica Grimmett says
The ASP must start policing the construction area from Haskell to Benton on I30. There will be deadly accidents daily if people do not start slowing down. Drivers are going way too fast and the big trucks are just a menace.